A twenty-year-old integration layer replaced without clinical downtime
We moved every interface from an end-of-life integration engine to a FHIR-based API layer and event bus, migrating in phases with parallel runs so no ward lost a feed.
- interfaces migrated with parallel runs
- 140
- lower integration running costs
- 38%
interfaces migrated with parallel runs
lower integration running costs
Full story
This write-up is still with the client.
We publish a case study once the client has approved every figure in it. In the meantime, a senior engineer can talk you through the architecture and what we would do differently.
More work
Other engagements
Supply chain
Recall tracing in minutes, not days, across a six-member consortium Read the case studyFintech
Settlement reconciliation that closes before the business day starts Read the case studyPublic sector
A tamper-evident registry, built on a database instead of a blockchain Read the case studyPlanning something similar?
Start with a 30-minute technical consultation, or a fixed-price feasibility assessment if a ledger is on the table.